Example result
What your method statement (RAMS) result looks like
See how a risk assessment and method statement (RAMS) review presents its findings. This made-up example shows the checks, the gaps found and what to ask for. It is not a review of an uploaded document.
AI-assisted document review. Check the findings against your RAMS and site before making a decision. This is not approval to start work.
What do the scoring terms mean?
A check is worth a share of the 100 points. Severity means how serious a gap is. A cap is the highest score the review can give when a serious gap is found.
Critical means a gap could lead to death or serious injury. Major means an important gap needs fixing before work starts. Minor means a smaller gap that would not affect safe working on its own. “No material gaps” means no significant gaps were found in the checks made; it is not approval to start work.
Review complete · PlanOps RAMS Review Standard v2.1.0
Roof-membrane-replacement-Block-C.pdf
A critical gap puts an upper limit on the score: this document should not be accepted as it stands, however good the rest of it is.
49out of 100
Serious gaps
Check these findings first
Most serious first
Check 8 of 20 · Emergency arrangements · worth 7 of the 100 points
Rescue for work at height is not evidenced
Harness and lanyard use is specified in section 6.2. No rescue arrangement, rescue equipment or named rescuer is given anywhere in the document. Suspension trauma is not mentioned.
What to ask for: a rescue plan naming who performs the rescue, with what equipment, within what time, and where the equipment is kept on site.
Not met
Critical
caps the score at 49
Check 6 of 20 · Hazard identification · worth 7 of the 100 points
Live-test and COSHH assessments not evidenced
Task hazards are identified, but the live-test assessment and product-specific COSHH assessments the controls depend on are not evidenced.
What to ask for: the live-test assessment and the COSHH assessments for the products named, attached to the RAMS rather than referenced.
Partially met
Major
Check 7 of 20 · Control measures · worth 8 of the 100 points
Controls deferred to documents that aren't attached
Controls are detailed, but live testing, pressure-test limits and fall-arrest recovery are deferred to task documents that aren't attached.
Partially met
Major
Check the findings against your site, project requirements and the work before making a decision. Checks that don't apply and checks not run are neither passed nor failed.
Example result
Check your own RAMS
Upload your RAMS to get a review like this. Use PlanOps to check RAMS and supporting documents together against your project requirements, and keep a RAMS register.
No document was uploaded or scored. This is a made-up example.